Boerhaave bath/farm bath

Haarlem, Netherlands

Renovation of the 25-year-old Boerhaave bath in Haarlem from blue to green

The aim of the renovation is to make the swimming pool more sustainable. The new ventilation units are larger than the old ones, which is why one was installed outdoors. These new climatic chambers provide a pleasant air quality and temperature. The goal of sustainability is achieved through highly efficient heat recovery and the use of energy-efficient fans.

The swimming pool consists of a 25 metre long competition pool with a diving board, a leisure pool with various water games such as rapids and bubble loungers and a 60 metre long slide.

High quality through modernization of the swimming pool technology

The Deutsche Rentenversicherung (DRV) Nordbayern is a reliable partner for prevention, rehabilitation, pensions and additional old-age provision in the northern part of Bavaria. It operates eight Bavarian rehabilitation centres which are certified according to the high quality standards of DIN EN ISO 9001:2015 and QMS-Reha® 3.0. The Rheumaklinik Bad Aibling also belongs to this group of clinics. In accordance with their own high expectations, the operators attach great importance to a particularly healing atmosphere during treatment. This also includes modern equipment for the treatment rooms required for the therapies and the swimming pool. "A rehabilitation clinic is inconceivable without the appropriate technology. This is why we pay attention to a high degree of quality and efficiency in the equipment we use," explains Josef Niehues, Commercial Director of the Bad Aibling Rheumatism Clinic. Those responsible decided in 2017 to modernise the outdated swimming pool air conditioning system. The new swimming pool unit CKL-Pool 30 GC from Wolf was planned by Klimax Lüftungs- und Klimaanlagen GmbH & Co. KG and installed it from February to March. The unit is coated on the inside and outside to protect it from corrosion caused by moisture and chlorine. In addition, the manufacturer supplied the product ready for connection, piped and wired, which made commissioning quick and easy. Translated with www.DeepL.com/Translator

  • Abridged information

    Completion: September 2018

    Function: Sports, Swimming pool

    Measure: Renovation of the Boerhaave swimming pool with WOLF ventilation units

  • System overview

    Units: 2 AHU-TE ventilation units

    Nominal volume flow: 16,500 m³/h and 27,000 m³/h

    Special feature: Humidity is kept under control - for durability and a long service life