wolf

WOLF KG Top

The modular air handling solution for your project

Modular air handling unit

WOLF KG Top

Long-life ventilation units with a modular design that allows flexible spatial configuration, combining the advantages of industrial production with the option of individual configuration – bringing maximal speed in the planning, producing and installation process.

For air volumes up to 40,000 m³/h

wolf

Highlights at a glance

The modular design of the KG Top series combines the efficiency of serial production with the flexibility of tailored configuration.
With 23 unit sizes available, your ideal system can be assembled in no time. Despite this unmatched configurability within the industry, WOLF guarantees short lead and delivery times. Whether for office buildings, hotels, industrial facilities, commercial properties or healthcare settings – the Eurovent certified KG Top delivers maximum efficiency and meets the highest demands. Every single module reflects over 60 years of German engineering expertise.

wolf

Heat recovery

  • Rotary heat exchanger esp. for ventilating office buildings, as in winter part of the humidity from the outgoing air is recovered and fed back
  • Two choices of Plate heat exchangers for separate airflows:compact Counterflow heat exchanger - heat transfer on four sides, supply and exhaust air flows are directed crosswise and simultaneously. Cross-flow heat exchanger for high volume ventilation systems – heat transfer on two sides, as the supply and exhaust air flows are directed crosswise and tightly with low pressure loss
  • HKVS system for 100% separation of supply and exhaust airflows
wolf

Low energy consumption

  • State of the art ventilation, infinitely variable, energy-efficient IE5 EC fans from the leading European manufacturers
  • Fanwall to save floor space and for the purpose of redundancy
  • External heat pump technology for decentralised heating and cooling supply
  • Separate or combined heating and cooling coils when using externally generated heat or cold

 

wolf

Hygiene

  • Construction in accordance with the hygiene common guidelines DIN 1946 – Part 4 and VDI 6022 for operation in clean rooms and operating theatres (class 1A)
  • Filters of all classes and sizes (Filter stages up to ISO ePM1 85% (F9)
  • Good accessibility for cleaning and maintenance purposes (Flip&Clean silencer, quick-clamping filter systems) and smooth and flat floors and surfaces made of stainless steel
  • Patented labyrinth sealing system Super Seal for 98% tightness
  • Hygroflow air humidification according to VDI 6022
wolf

Control

  • Plug & play with full wiring and optimally positioned sensors for units with different requirements
  • Individual and parameterised for the most economical operation
  • Modbus or BACnet interface for easy connection with building management systems
  • Can always be retroactively and customzied expanded
  • Installation in external control cabinet or alternatively integrated in the unit

 

KG Top - Grundrahmen Kranbefestigung

Housing

  • Made for the most stringent static, thermal and hygienic requirements
  • Thermally and acoustically decoupled, 50 mm thick steel profile
  • Meets L1; D1; T2; TB2 and- non-flammable building material class according to DIN 4102: A1 (tested by TÜV Süd according to DIN EN 1886)
  • Easy Lifting for transport by crane or helicopter
  • Powder-coated inside and out in any RAL colour, optionally with saltwater-resistant C5-M paint
wolf

ATEX

  • All Housing, add-on parts and built-in parts electrically are electrically conductive and designed with potential equalisation
  • Air filter with ATEX certification with conductive filter medium in conductive filter mounting frame
  • Fans with ATEX certification according to classification
  • WOLF checklist for the specialist planner, operator and system manufacturer to easily classify the AHU in accordance with the directives
wolf

Request for more information

Are you interested in our products and would you like advice specifically for your situation?

Contact us

Customised to your needs

The KG Top is optimized regarding its CO2 Footprint and we can demonstrate this with our certified Air Handling Calulator. At the same time the KG Top is available with minimum delivery times and the option of maximum speed on the construction site.

Green Steel
For certified green buildings

Choose our green steel option with a reliable proof of the COe, when you want an outstanding green air handling solution.

Learn more
Green Steel
For certified green buildings

Choose our green steel option with a reliable proof of the COe, when you want an outstanding green air handling solution.

CO2 Footprint
Entire product cycle

Our TÜV Süd certified calculator calculates the CO2-Footprint from production to the recycling process over a 25-year service life.

Learn more
CO2 Footprint
Entire product cycle

Our TÜV Süd certified calculator calculates the CO2-Footprint from production to the recycling process over a 25-year service life.

Delivery time
Always the fastest

Thanks to direct data transmission from our calculator to the WOLF production site in Mainburg, we guarantee the shortest delivery times.

Learn more
Delivery time
Always the fastest

Thanks to direct data transmission from our calculator to the WOLF production site in Mainburg, we guarantee the shortest delivery times.

Delivery in one piece
Save your time

Optional delivery fully assembled on a base frame with individually configured pre-wiring for faster installation.

Learn more
Delivery in one piece
Save your time

Optional delivery fully assembled on a base frame with individually configured pre-wiring for faster installation.

Green Steel
For certified green buildings

Choose our green steel option with a reliable proof of the COe, when you want an outstanding green air handling solution.

Learn more
CO2 Footprint
Entire product cycle

Our TÜV Süd certified calculator calculates the CO2-Footprint from production to the recycling process over a 25-year service life.

Learn more
Delivery time
Always the fastest

Thanks to direct data transmission from our calculator to the WOLF production site in Mainburg, we guarantee the shortest delivery times.

Learn more
Delivery in one piece
Save your time

Optional delivery fully assembled on a base frame with individually configured pre-wiring for faster installation.

Learn more

Everything else you need to know: